help_outline Skip to main content

News / Articles

Building an N37

A N37 is seen here being assembled at the Great Harbour Trawlers plant. The video starts with the bare hull and shows the installation of the stringers and the integral fuel tanks. The bulkheads and floors are installed and the deck is set and bonded to the hull. Still left is the setting of the pilot house, roof on top of that and finishing out the interior and exterior.

https://youtu.be/DXDxKPQONKk